A step further back looking through the doorway. A corner cupboard is on the left and the two entrances to the building are on the right.
A view of the work area from the other direction.
A view of the work area from the other direction.
The studio has been repainted, the gravel has been removed to aid wheelchair access and heaters, power sockets and security grills have been fitted.
There are still a couple of things that need to be done - the sink needs fitting and we need to fit a picture rail or find another way how we can hang paintings without damaging the walls.
If you would like to come and visit on the 27th February, the building will be open from 11:30am till 4:00pm
No comments:
Post a Comment